TMI BlogBoost to Rail connectivity in AssamX X X X Extracts X X X X X X X X Extracts X X X X ..... Boost to Rail connectivity in Assam - News and Press Release Dated:- 17-7-2019 - News - Boost to Rail connectivity in Assam Cabinet approves doubling of New Bongaigaon - Agthori via Rangiyarailway line (142.97 km) Project will traverse through Bongaigaon, Baksa, Barpeta, Nalbari and Kamrup districts This project will generate direct employment during construc ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... tion for about 34.31 lakh mandays The total estimated cost of this project is ₹ 2042.51 crore and will be completed by 2022-23 The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has given its approval to construct the New Bongaigaon and Agthori via Rangiya doubling (142.97 km) of Northeast Frontier Railway in Assam with an esti ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... mated cost of ₹ 2042.51 crore. The project will be completed by 2022-23 and will be executed by Construction Organization of Northeast Frontier Railway. The line capacity utilization of the section between New Bongaigaon and Agthori via Rangiya is more than 100%. Traffic on this section will further increase as Rangiya-Murkongselek Broad Gauge line has already been commissioned ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... in 2015-16 and Bogibeel Bridge new line has been commissioned recently. To remove the existing capacity constraints of existing network and to handle the increasing freight and passenger traffic, doubling of New Bongaigaon - Agthori via Rangiya is required. Overall operative performance of New Bongaigaon - Agthori via Rangiya will improve by the doubling and congestion of section will also reduce ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... to the great extent. The project will ease the growing through traffic into the North East region and saving due to faster mobility through the proposed double line section. This project will also generate direct employment during construction for about 34.31 lakh mandays. The alignment for the approved doubling from New Bongaigaon to Agthori via Rangiya (142.97 km) will ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... traverse through Bongaigaon, Baksa, Barpeta, Nalbari and Kamrup districts of Assam. ***** AKT/PK/SH - News - Press release - PIB Tax Management India - taxmanagementindia - taxmanagement - taxmanagementindia.com - TMI - TaxTMI - TMITax ..... X X X X Extracts X X X X X X X X Extracts X X X X
|