TMI BlogSeeks to notify special procedure to be followed by a registered person engaged in manufacturing of certain goods.X X X X Extracts X X X X X X X X Extracts X X X X ..... ling and packing of pouches or containers in FORM SRM-I, within 30 days of issuance of this notification, electronically on the common portal, FORM SRM-I S. No. Make and Model No. of the Machine (including the name of manufacturer) Date of Purchase of the Machine Address of place of business where installed No. of Tracks Packing Capacity of each track Total packing capacity of machine Electricity consumption by the machine per hour Supporting Documents Unique ID of the machine (to be auto populated) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Capacity certificate from Charter ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... business where installed No. of Tracks (1) (2) (3) (4) (5) (6) Packing Capacity of each track Total packing capacity of machine Electricity consumption by the machine per hour Supporting Documents Unique ID of the machine (to be auto populated) (7) (8) (9) (10) (11) Capacity certificate from Chartered Engineer (6) The details of any existing filling and packing machine removed from the registered place of business shall be furnished, electronically on the common portal, by the said registered person within 24 hours of such removal in FORM SRM-IIB. FORM SRM-IIB [Details of removal of the existing machine(s)] Serial No. Unique ID of the machine Make and Model No. of the ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... (3) (4) (5) (6) (7) (8) (9) HSN1 HSN2 HSN3 : : : HSNn Day 2 Day 3 Last Day of Month Day 1 Electricity Reading Electricity meter reading Generator set meter reading ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... Shift 3 00:00 to 00.00 hrs Total for Day 1 Day 2 .Dayn of the month ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... Total for the Month Electricity Reading Electricity meter reading DG set meter reading Initial Meter Reading on Day 1 of the month Final Meter Reading on last day of the month Consumption (kwH) Initial Meter Reading on Day 1 of the month Final Meter Reading on last day of the month Consumption (kwH) (1) (2) (3) (4) (5) (6) Statement of production of goods PART-B Brand B1 Bra nd B2 Bra nd Bn Machine M1 M 2 M n Total of all ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... not bearing a brand name. 8. 2403 19 10 Smoking mixtures for pipes and cigarettes 9. 2403 19 90 Other smoking tobacco bearing a brand name 10. 2403 19 90 Other smoking tobacco not bearing a brand name 11. 2403 91 00 Homogenised or reconstituted tobacco, bearing a brand name 12 2403 99 10 Chewing tobacco (without lime tube) 13. 2403 99 10 Chewing tobacco (with lime tube) 14. 2403 99 10 Filter khaini 15. 2403 99 20 Preparations containing chewing tobacco 16. 2403 99 30 Jarda scented tobacco 17. 2403 99 40 Snuff 18. 2403 99 50 Preparations containing snuff 19. 2403 99 60 ..... X X X X Extracts X X X X X X X X Extracts X X X X
|