TMI Blog2008 (7) TMI 281X X X X Extracts X X X X X X X X Extracts X X X X ..... e for civil construction on the basis of drawings/design supplied and we find, there was only 7% of the actual final cost of work is received by the applicant i.e. for establishment and over-head charges – stay granted - ST/S/332/2008-CST - ST/277/2008-(PB), - Dated:- 10-7-2008 - S/Shri S.S. Kang, Vice-President and Rakesh Kumar, Member (T) Shri Ravi Raghvan with Ms. Tejaswi Hari Krisma, A ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... ost of work to cover all charges such as establishment, overheads etc. for execution of works. The contention is that the buildings will be contracted as per the drawings given by the State Govt. and this 7% is only to cover up the establishment charges. 3. The contention of the revenue is that scope of consultancy service includes pre-design service, basic design engineering, procurement, con ..... X X X X Extracts X X X X X X X X Extracts X X X X
|