TMI BlogContainer Scanning Operations and Examination revised procedures.X X X X Extracts X X X X X X X X Extracts X X X X ..... ised procedures. Ref : Public Notice no. 42/2015 dt.23.10.2015 Public Notice No. 24/2017 dated 28.02.2017 issued in regards to installation and commissioning of Customs AXIS X-ray scanner facility at Wadi Bunder, Near Frere Basin, Mumbai Port Road, Mumbai Port-reg Attention of all the Shipping Lines, Custodians of all CFSs of Mumbai Port and Mumbai Port Officials and other stakeholde ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... canning at AXIS X-ray scanner facility at Wadi Bunder, Near Frere Basin, Mumbai Port Road, Mumbai Port shall not be required to bring at the CSD section for stamping at FIR and shall be moved to port directly for 100% examination under supervision of DC/Docks. CSD section will inform MBPT and DC Docks through E-mail and also provide the list of containers selected for scanning. The record of Each ..... X X X X Extracts X X X X X X X X Extracts X X X X
|