TMI BlogTata Power restores operations of fire-hit unit at Trombay plantX X X X Extracts X X X X X X X X Extracts X X X X ..... Tata Power restores operations of fire-hit unit at Trombay plant X X X X Extracts X X X X X X X X Extracts X X X X ..... t its Trombay Thermal Power Station in Mumbai, which was affected due to a fire incident in September last year. The unit was affected by fire in the cable vault on September 23, 2024, Tata Power sa ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... id in an exchange filing. The company "has successfully restored unit 5 (500 MW) at its Trombay Thermal Power Station in record time ensuring power supply to the grid after a fire in the cable vault ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... on September 23, 2024", it said. The fire had temporarily disrupted operations, but Tata Power's Trombay team, in coordination with fire safety authorities, quickly contained the incident, assessed ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... the damage, and executed a rapid restoration plan, ensuring minimal disruption to power supply. PTI ABI HVA X X X X Extracts X X X X X X X X Extracts X X X X
|