Removal of inputs, Central Excise |
||
|
||
Removal of inputs |
||
EOU, permission to subcontract part of the production process in DTA granted by the AC/DC ALONG WITH SPECIFIC PERMISSION TO REMOVE INPUTS(PROCURED AGAINST CT-3) DIRECTLY FROM SUPPLIER TO JOB WORK PREMISES. Can we remove Inputs (which are being procured against CT-3) directly from Supplier to Job work, whereas as per rule material first be brought from manufacutrer/supplier premises to EOU Bonded premises. Liability of EOU ? Posts / Replies Showing Replies 1 to 1 of 1 Records Page: 1
For this purpose, you need to take specific permission from the AC/ DC. However, before granting any permission, he may ensure that you should not assign the entire (or substantial) manufacturing operations to the units in the DTA on job work basis.