Tax Management India. Com
Law and Practice  :  Digital eBook
Research is most exciting & rewarding
  TMI - Tax Management India. Com
Follow us:
  Facebook   Twitter   Linkedin   Telegram

TMI Blog

Home

SEZ - AUTHORIZED ACTIVITIES WHICH CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... SEZ - AUTHORIZED ACTIVITIES WHICH CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION - Commentaries / Editorials Dated:- 2-8-2009 - News - Instruction no. 20 has been issued to clarify the activities that CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION. Since a time gap exists between the date .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... of notification and actual approval of the authorized operations by the Board of Approval, to avoid delays in the project implementation, the authorized activities were approved by the Board of Approval as default operations which may be carried out by the Developer or Co-Developer, as the case may be, after the SEZ is notified. The list of default activities has been given to annexure to the .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... instruction. The list of authorized operations are as under: (A) Information Technology/Information Technology Enabled Services, Biotechnology and Gems and Jewellery Special Economic Zone: 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... capacity. 3. Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary sub-stations of appropriate capacity, pipeline network etc. 5. Telecom and other communications facilities including internet connectivity 6. Rain water har .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... vesting plant 7. Air conditioning of processing area 8. Fire protection system with sprinklers, fire and smoke detectors 9. Landscaping and water bodies 10. Boundary wall 11. Built up processing area not less than minimum prescribed 1 lakh sq. m. 12. Office space for Customs and Security staff not exceeding 500 sq.m. (B) Sector Specific Special Economic Zones 1. Roads with Street .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network inc .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... luding necessary substations of appropriate capacity, pipeline network etc. 5. Effluent treatment plant and pipelines and other infrastructure for Effluent treatment. 6. Telecom and other communications facilities including internet connectivity 7. Rain water harvesting plant 8. Landscaping and water bodies 9. Wi Fi and / or Wi max Services 10. Drip and Micro irrigation systems. 11. .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... Boundary wall 12. Factory sheds in processing area 13. Office space for Customs and Security staff not exceeding 500 sq.m. (C) Multi Product Special Economic Zones 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and gar .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... bage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc. 5. Effluent treatment plant and pipelines and other infrastructure for Effluent treatment. 6. Play ground 7. Landscaping and .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... water bodies 8. Wi Fi and / or Wi max Services 9. Drip and Micro irrigation systems. 10. Boundary wall 11. Factory sheds 12. Office space for Customs and Security staff not exceeding 500 sq.m. See: Instruction no. 20 - News - Press release - PIB Tax Management India - taxmanagementindia - taxmanagement - taxmanagementindia.com - TMI - TaxTMI - TMITax .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

 

 

 

 

Quick Updates:Latest Updates