TMI BlogProduction Performance of Oil & Natural Gas sector for the month of September, 2012X X X X Extracts X X X X X X X X Extracts X X X X ..... Production Performance of Oil & Natural Gas sector for the month of September, 2012 - News and Press Release Dated:- 25-10-2012 - News - Press Information Bureau Government of India Ministry of Petroleum Natural Gas 25-October-2012 12:28 IST I. A. CRUDE OIL PRODUCTION PERFORMANCE Month / Period Planned Target (TMT) Actual Production (TMT) %age achievement Surplus(+) Shortfall(-) Vis- -vis target (%age) Surplus(+) Shortfall(-) over last year (%age) September, 2012* 3252.355 3066.549 94.3 -5.7 -1.7 April-September, 2012* 19758.530 19084.016 96.6 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... -3.4 -0.8 April-September, 2011 19229.089 TMT: Million Metric Tonnes. *: Provisional. B. COMPANY-WISE ACHIEVEMENT Company / State Planned Target (TMT) Actual Production (TMT) %age achievement Surplus(+) Shortfall(-) (%age) ONGC 1937.400 1810.000 93.4 -6.6 Gujarat 440.000 418.000 95.0 Andhra Pradesh 22.000 23.000 104.5 Tamil Nadu 17.000 21.000 123.5 Assam 98.000 102.000 104. ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... 1 Tripura 0.4000 2.0000 500.0 Mumbai Region (incl Mumbai High) 1360.000 1244.000 91.5 OIL 324.300 305.029 94.1 -5.9 Assam 322.300 303.237 94.1 Arunachal Pradesh 2.000 1.792 89.6 PRIVATE/JVC 990.655 951.520 96.0 -4.0 TOTAL 3252.355 3066.549 94.3 -5.7 C. REASONS FOR SHORTFALL Company / State Reasons for shortfall ONGC (Gujarat ) Poor Influx, increasing water cut tr ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... end Power shutdown. ONGC (Mumbai High Offshore) Less than anticipated oil gain from development wells, side track, new workover wells. Production affected due to less than anticipated oil gain from Vasai East. Delay in project execution of G-I field. OIL (Assam Arunachal Pradesh) Several OIL Bandhs/Blockades by various Groups during the month of September, 2012 and frequent miscreants activities in the fields. Pvt./JVCs ( Rajasthan) Less than estimated oil production from Bhagyam field. Pvt./JVCs ( Arunachal Pradesh) Only producing well Amguri # 14 ceased to flow since October, 2011 due to sand ingress in wellbore. Pvt./JVCs ( Weste ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... rn Offshore-Panna-Mukta) Lower oil production due to delay in well intervation jobs, and underperformance of MA # 4 # 8 wells. NANG production is less due to almost no flow from PG#1 # 10 wells. A statement showing Crude Oil Production during September, 2012 and cumulatively for the period April- September, 2012 vis- -vis 2011-12 planned production is at Annexure-I. II. A. REFINERY PRODUCTION (IN TERMS OF CRUDE THROUGHPUT) Month / Period Planned Target (MMT) Actual Production (MMT) %age achievement Surplus(+) Shortfall(-) Vis- -vis target (in %age) Surplus(+) Shortfall(-) over last year (in %age) S ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... eptember, 2012* 14.225 14.129 99.3 -0.7 11.4 April- September, 2012* 87.041 88.178 101.3 1.3 5.4 April- September, 2011 83.649 *: Provisional. The crude throughput in IOC (Barauni, Mathura Panipat), BPCL (Mumbai Kochi ), HPCL (Mumbai), MRPL (Mangalore), RIL (Jamnagar) Essar Oil Ltd. Vadinar refineries have exceeded their planned target. The crude throughput in IOC (Guwahati, Koyali, Haldia, Digboi Bongaigaon), BORL (Bina), HPCL (Visakh), CPCL (Manali Narimanam), NRL (Numaligarh) ONGC Tatipaka refineries was less than their planned target. ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... B. REASONS FOR SHORTFALL : Company / State Reasons for shortfall IOC (Haldia) Throughput is restricted due to Breech Lock Exchanger problem in Hydro Cracker unit. IOC (Guwahati) Throughput lower due to extended planned shutdown for Coker revamp. IOC (Koyali) Throughput is restricted due to high inventry of Raw Petroleum Coke and Black Oil. IOC (Bongaigaon) Throughput lower due to power plant outage. HPCL, Visakh Throughput lower than the MOU excellent Target due to deferment of planned CDU-III shutdown. BORL, Bina On three occassions there was a state grid power failure affecting po ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... wer supply to the units, resulting in reduction in Crude Throughput. Refinery was under shutdown from 31st August 2012 to 25th September 2012 for maintenance works in Hydrogen unit Refinery flare system. A statement showing refinery-wise production during the month of September, 2012 and cumulatively for the period April- September, 2012 vis- -vis 2011-12 planned target is at Annexure-II. III. REFINERY CAPACITY UTILISATION [excluding RPL(SEZ)] Month Utilisation (%) Period Utilisation (%) September, 2012* 97.1 April- September, 2012 99.3 September, 2011 96.5 April- September, 2011 104.3 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... The refinery-wise details of the capacity utilisation during September, 2012 and cumulatively for the period April- September, 2012 vis-a-vis 2011-12 are given in Annexure-III. IV. A. NATURAL GAS PRODUCTION Month / Period Planned Target (MCM) Actual Production (MCM) %age achieve-ment Surplus(+) Shortfall(-) Vis- -vis target (%age) Surplus(+) Shortfall(-) over last year (%age) September, 2012* 3393.969 3362.764 99.1 -0.9 -14.8 April- September, 2012* 20534.006 21353.025 104.0 4.0 -12.5 April- September, 2011 24406.602 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... MCM: Million Cubic Metres. *: Provisional. B. COMPANY-WISE ACHIEVEMENT Company / State Planned Target (MCM) Actual Production (MCM) %age achievement Surplus(+) Shortfall(-) (%age) ONGC 1941.134 1924.277 99.1 -0.9 Gujarat 104.444 150.320 143.9 Rajasthan 1.219 1.379 113.1 Andhra Pradesh 83.239 98.107 117.9 Tamil Nadu 111.230 99.851 89.8 Assam 37.381 41.815 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... 111.9 Tripura 84.553 48.169 57.0 Mumbai High Offshore 1519.068 1484.636 97.7 OIL 254.000 225.229 88.7 -11.3 Assam 232.000 204.600 88.2 Arunachal Pradesh 1.600 1.762 110.1 Rajasthan 20.400 18.867 92.5 PRIVATE/JVC 1198.835 1213.258 101.2 1.2 Onshore $ 11.099 64.166 578.1 Offshore 1187.736 1149.092 96.7 TOTAL 3393.969 ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... 3362.764 99.1 -0.9 $: Including Coal Bed Methane production. C. REASONS FOR SHORTFALL Company / State Reasons for shortfall ONGC ( Tripura) Less offtake by consumers. ONGC (Offshore) Delay in Project execution of G-1 field. OIL (Assam ) Less drawal by BVFCL and LTPS and less than desired production potential. Pvt./JVCs ( KG-DWN-98/3) Oil/ Gas production is much less in D1,D3 MA fields Vis- -vis FDP approved rates. Total 6 wells in D1d,D3 2 wells in MA have ceased to flow due to water/sand ingress. A statement showing natural gas production during Se ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... ptember, 2012 and cumulatively for the period April- September, 2012 vis- -vis 2011-12 is at Annexure-IV. Click here to see Annexure-I Click here to see Annexure-II Click here to see Annexure-III Click here to see Annexure-IV RCJ/RKS - News - Press release - PIB Tax Management India - taxmanagementindia - taxmanagement - taxmanagementindia.com - TMI - TaxTMI - TMITax ..... X X X X Extracts X X X X X X X X Extracts X X X X
|