..... k has been completed by now pursuant to the order passed by this court on 15th March, 2018. Status Report with respect to the Leisure Park be submitted in this Court on the next date of hearing with respect to the time to be consumed for completion of the A & B part as well as what is the proposal contained in the C part of the note submitted by Sh. M.L. Lahoti, today. - Writ Petition (s) (Civil) No(s). 940/2017 - - - Dated:- 27-3-2018 - MR. ARUN MISHRA AND MR. UDAY UMESH LALIT, JJ. For The Petitioner : Mr. Paban K. Sharma, Adv. Mr. Anchit Sripat, Adv. Ms. Ishita Bisht, Adv. Mr. Himanshu Shekhar, Adv. Mr. Jamnesh Kumar, Adv. Mr. Abhinav Jain, Adv. Mr. Himanshu Shekhar, AOR Mr. Jamnesh Kumar, Adv. Mr. Himanshu Shekhar, AOR Mr. Ajit Kumar Sinha, Sr.Adv. Mr. Ashwarya Sinha, AOR Mr. Shwetabh Sinha, Adv. Ms. Nitya Ramakrishnan, Adv. Ms. Priyanka Rao, Adv. Mr. Shadan Farasat, AOR Ms. Rudrakshi Deo, Adv. Ms. Sunena, Adv. Mr. D.K. Garg, Adv. Mr. Abhishek Garg, Adv. Mr. Dhananjay Gasrg, Adv. Mr. Deepak Mishra, Adv. Mr. Rahul Agarwal, Adv. Mr. R.P. Bansal, Adv. Ms. Chandan Ramamurthi, AOR Mr. R. Sathish, AOR Mr. Mohan Das K.K.,Adv. Mr. Rajesh Kumar, Adv. Ms. S. Geetha, Adv. Ms. Sm .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... t Banerjee, Sr.Adv. Ms. V. Mohana, Sr. Adv. Mr. S.S. Shamsherry, Adv. Mr. Mukul Singh, Adv. Mr. Mukesh Kumar Maroria, AOR, Mr. Ranjit Kumar, Sr.Adv. Mr. Gaurav Bhatia, AOR Mr. Utkarsh Jaiswal, Adv. Mr. Abhishek Singh, Adv. Mr. Anuroop Chakravarti, Adv. Mrs. Anil Katiyar, AOR Mr. Subodh K. Pathak, Adv. Ms. Prinita Shekhar, Av. Mr. Pawan K. Sharma, Adv. Mr. Shashi Ranjan, Adv. Mr. Dharmendra Kumar Sinha, AOR Mr. Anoop Prakash Awasthi, Adv. Mr. Sukant Vikram,Adv. Mr. A. Ankit., Adv. Mr. Apurv Chandola, Adv. Mr. Anshumaan Sahni, Adv. Mr. Sumant Batra, Adv. Ms. Honey Satpal, Adv. Mr. Rajesh Kumar Gupta, Adv. Mr. Ranjit Kumar, Sr.Adv. Mr. Alok K. Agarwal, Adv. Mr.Dhruv Gandhi, Adv, Ms. Rati Tandan, Adv. Mr. Gaurav Goal, Adv. Mr. Alok Kumar, Adv. Mr. Somya Yadav, Adv. Mr. Siddhant Tripathi,Adv. Mr. Kumar Mihir, Adv. ORDER All the Impleadment applications are allowed to the extent of intervention only. W.P. No. 245/2018 and D. No. 11200 of 2018 be tagged with the instant matters. Heard learned counsel for the parties and perused the note that has been submitted by Sh. M.L. Lahoti, learned counsel, pursuant to the direction of this court dated 15th March, 2018. Schedule of .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... Noida (W.P. No. 245 of 2018) 22 Towers 2217 Units 1650 Units 567 Units (Tower Q R comprising of total 182 Units are not ready and no possession is given) 1. Firefighting system Except for Towers G, H, S T firefighting system in all Towers is incomplete and not operational. 2. Sewage Treatment Plant is incomplete and not operational. 3. Electrical Substation- 1 substation is yet to be installed. 4. Electrical rising main meter board Incomplete in Towers A, B, C, Q, R W. 5. Water Treatment Plant Domestic Pump is not operational. Approximately ₹ 80 Crores 3. Amrapali Eden Park, Sector 50, Noida (W.P. No. 21 of 2018) 4 Towers 316 Units All Units Nil 1. Firefighting System Installed but not operational. 2. Lifts No license obtained. 3. Water Treatment Plant Installed capacity is 10,000 cm whereas, required capacity is 40,000 cm. 4. Electricity Only 1 out of 2 transformers is installed. 2 Standby generators are installed out of which .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... G sets, common area lighting and wiring are to be completed. 9. Surveillance system through CCTV and control room is to be installed. 10. Basement parking is to be constructed. 11. Modifications in the project has been done without the consent of homebuyers on the basis layout drawing in 2012 which was different from original drawing approved in 2010. Certain projects which have been placed in Category B where some of the towers are at advanced stage of construction and can be handed over possession shortly, they are as under: B. Projects where some of the Towers are at advanced stage of construction and can be handed over possession shortly Sl. No. Project Name Total Tower Units Tower-wise construction status Approximate time Total amount collected Total amount spent Amount required 6. Amrapali Golf Grater Noida (W.P. No. 1116 of 2017) 42 Towers 4,210 Units a . 5 Towers B1 to B5 consisting of 5 .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

..... s complete. b . In Towers B1 to B6, C1, C2, C3, C5, C11, C12, E2, E4, F1, F2, F3, F6, F8, F9 F10, structure is completed up to 7th Floor to 14th Floor out of Total 26 Floors. c . In Towers C4, D1, D2, E1, E3, E5 to E8, F4, F5, F7, F11 F12, structure is at a very lower stage and is completed up to 1st Floor to 6th Floor out of Total 26 Floors. d . In Towers H1 to H5 no work has started as of now. Possession can be given in 10 to 12 Months Possession can be given in 18 to 20 Months Possession can be given in 28 to 30 Months Possession can be given in 34 to 36 Months ₹ 1,439.34 Crores (approximately) ₹ 877 Crores (approximately) ₹ 1,165 Crores (approximately) 9. Leisure Park, Greater Noida (W.P. No. 08 of 2018) 22 Towers 2,076 Units 19 Towers (A1 to A6, B1 to B5, E1 to E4 F1 to F4) consisting of 1,565 Units are at advanced stage of construction out of which Towers E1, E2, F1 F2 are at almost completion stage. Possession of Units in Towers E1, E2, F1 F2 can be handed over in 3 t .....

X X   X X   Extracts   X X   X X

→ Full Text of the Document

X X   X X   Extracts   X X   X X

 

 

 

 