TMI BlogFifth ScheduleX X X X Extracts X X X X X X X X Extracts X X X X ..... t;Rs. 45 per quintal" shall be substituted; (3) in sub-heading Nos. 5801.30, 5802.14 and 5804.12, for the entry in column (4), the entry 10% plus Rs 2.10 per square metre" shall be substituted; (4) in sub-heading Nos. 5901.20 and 5905.20, for the entry in column (4), the entry "10% plus Rs. 2.10 per square metre" shall be substituted; (5) in sub-heading Nos. 5902.10 and 5902.20, ..... X X X X Extracts X X X X X X X X Extracts X X X X
|