Valuation - The value of ‘engineering drawings’ is a ...
Case Laws Customs
September 17, 2016
Valuation - The value of ‘engineering drawings’ is a post-importation cost. No evidence has been adduced to show that the provision of these ‘drawings’ is conditional to placing order for equipment or that it is a pre-importation cost - value not allowed to be enhanced - AT
View Source