Home Schedules Standards of Input Output Norms (SION) G. Leather Products This
Forgot password New User/ Regiser ⇒ Register to get Live Demo
Gents Leather Shoe Uppers(Stitched/unstitched) - Standards of Input Output Norms (SION) - G. Leather ProductsExtract 1 [G13 Gents Leather Shoe Uppers(Stitched/unstitche d) 1 Pair 1 a) Synthetic lining/Artificial furlining. 1.75 sq ft b) Full insole socks (Synthetic) 0.5 sq ft c) Adhesive (Synthetic/ latex ) 10.00 gms d) Shoe Finishes (Polish) 5.00 gms e) Shoe finishes (Spray) 10.00 gms f) Stamping foil 06.00 sq. inch g) Sewing thread 25 mtrs h) Thermoplastic sheets for :- 1. Counter 0.014 sq. mtr. 2. Toe Caps/ puffs 0.009 sq mtr 1 i) Re-inforcement tape (max width 1.5 cms) 0.50 mtr j) Eyelet Net content + 1% wastage k) Metallic fittings Net content + 1% wastage l) Zip fasteners Net content + 1% wastage m) Labels / Logos Net content + 1% wastage n) Elastic Net content + 1% wastage o) Velcro-tape Net content + 1% wastage 2 a) Clicking boards As in Note 1 Below b) Binding Guage c) Industrial sewing machine needles/ hammer needle d) Bell/ Skiving Knives e) Band knives for splitting M/c. f) Grinding wheels g) Feed Rollers h) Silver marking pencils/ pens/ refills i) Abrasive paper/ emery paper/ belts/ cup shapes j) Brushes of all types k) Sea Sponge l) Plastic shoe last m) Cutters and trimmers (all types) for footwear making 3 Reinforcement materials Net + 5% wastage, 4 Backer Lining Material Net + 5% wastage 5 Footbed 1 pair 6 Shoe-Lace Net toNet 7 Foam Net toNet 8 Steel/ Carbon Toe Cap Net toNet 9 Decoration items Reflectors 0.052 sq.mtr 10 Webbing Tape 1.5 mtr 11 Wool Lining 0.285 sq mtr. 12 Welt 1 pair 13 Hang Tag Net toNet 14 Conduction Thread 15 Mtr. 15 Relevant Finished Leather If Synthetic lining and full insole socks synthetic are not asked for 4.68 sq.ft. If Synthetic lining not asked for 4.13 sq.ft. full insole socks synthetic not asked for 2.75 sq.ft Synthetic lining and full insole socks synthetic are asked for 2.20 sq.ft. Note: 1. Items 2 (a) to 2 (m) above (i.e. all items taken together) allowed upto 5% of FOB value of export or 5% of Invoice Value in case of Deemed Export Note: 2. In case finished leather is manufactured from wet blue/wet white Leather/ Crust Leather, processing chemicals required for manufacturing of finished leather shall be allowed as per Note 7 under the 'General Notes for Leather and Leather Products' and input item no 15 above will not be allowed. Note: 3. If footwear is waterproof, then the following materials will be allowed Waterproof lining 0.12 sqm.tr Waterproof tape 2.0 mtr Waterproof Label/ Logo Net + 1% wastage (instead of item 1 (m) i.e. Labels/Logos) Stroble Layer 1 0.049 sq.mtr Stroble Layer 2 0.065 sqm.tr ] ***************** NOTES:- 1. Substituted vide Public Notice No. 30/2023 dated 31-08-2023 before it was read as, G13 Gents Leather Shoe Uppers(Stitched/unstitched) 1 Pair 1 a) Synthetic lining/Artificial furlining. 1.75 sq ft b) Full insole socks (Synthetic) 0.5 sq ft c) Adhesive (Synthetic/ latex) 10.00 gms d) Shoe Finishes (Polish) 5.00 gms e) Shoe finishes (Spray) 10.00 gms f) Stamping foil 06.00 sq. inch g) Sewing thread 25 mtrs h) Thermoplastic sheets for :- 1. Counter 0.014 sq. mtr. 2. Toe Caps/ puffs 0.009 sq mtr 1 i) Re-inforcement tape (max width 1.5 cms) 0.50 mtr j) Eyelet Net content + 1% wastage k) Metallic fittings Net content + 1% wastage l) Zip fasteners Net content + 1% wastage m) Logos Net content + 1% wastage n) Elastic Net content + 1% wastage o) Velcro-tape Net content + 1% wastage 2 a) Clicking boards 1 No per 7500 Pairs b) Binding Guage 1 No per 10000 Pairs c) Industrial sewing machine needles/ hammer needle 40 Pcs per 1000 Pairs d) Bell/ Skiving Knives 1 No per 2250 Pairs e) Band knives for splitting M/c. 1 No per 2250 Pairs f) Grinding wheels 2 Nos per 1000 Pairs g) Feed Rollers 1 No per 1000 Pairs Note: 1. For requirement of processing Chemicals as per Note 7 under the 'General Notes for Leather and Leather Products', finished leather required per pair is (i) 4.25 sq.ft. if item 1(a) and 1(b) are not asked for, (ii) 3.75 sq.ft. ifitem 1(a) is not asked for, (iii) 2.5 sq.ft. if item 1(b) is not asked for, and (iv) 2.00 sq.ft. if 1(a) (b) is asked for.
|