TMI BlogDefault authorized operationsX X X X Extracts X X X X X X X X Extracts X X X X ..... s as earlier communicated vide letter no. F.2/1/2007-SEZ dated 26.06.2007. The issue relating to authorized operations in the notified SEZs was discussed in the meeting of the Board of Approval held on 22nd June 2007. Since a time gap exists between the date of notification and actual approval of the authorized operations by the Board of Approval, to avoid delays in the project implementation, the ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... rom the date of Notification (A) Information Technology/Information Technology Enabled Services, Biotechnology and Gems and Jewellery Special Economic Zone:- 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and garbage di ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... gnage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary subst ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... al plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc. 5. Effluent treatment plant and pipelines and other infrastructure for Effluent treatment. 6. Play ground 7. Landscaping and water ..... X X X X Extracts X X X X X X X X Extracts X X X X
|