TMI Blog2018 (6) TMI 1719X X X X Extracts X X X X X X X X Extracts X X X X ..... ): Mr. Rajeev Mannadiar, Resolution Professional. M.K. Shrawat, AD-INTERIM-ORDER 1. In the case of Corporate Debtor M/S. Petron Engineering Construction Limited an Order was passed U/s 9 of the Insolvency Code on 23.03.2018 by appointing Resolution Professional (supra) and pronounced the commencement of "Moratorium". 2. This Miscellaneous Application is submitted on 11.06.2018 by the Resoluti ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... d issued Completion Certificate and the "Defect Liability Period" has also MA 521 OF 2018 Rajeev Mannadiar, Resolution Professional Kohinoor Crane Services Vs. Petron Engineering Construction Limited elapsed on 15.09.2017, GAIL India Limited should not be allowed to demand State Bank of India for revocation of the Bank Guarantee. 4.1. Further, the admitted factual position is that "Moratorium" ha ..... X X X X Extracts X X X X X X X X Extracts X X X X
|