Home Acts & Rules Customs Regulations Project Imports Regulations, 1986 This
Forgot password New User/ Regiser ⇒ Register to get Live Demo
Regulation 7 - Finalisation of contract - Project Imports Regulations, 1986Extract 7. Finalisation of contract. - The importer shall within three months from the date of clearance for home consumption of the last consignment of the goods or within such extended period as the proper officer may allow, submit a statement indicating the details of the goods imported together with necessary documents as proof regarding the value and quantity of the goods so imported in terms of this Regulation and any other document that may be required by the proper officer for finalisation of the contract.] TABLE Sr.No. Name of the Plant or Project Sponsoring Authority 1. All plants and projects under SSI Units. Director of Industries of the concerned State. 2. 8 [ All Power Plants and Transmission Projects, other than solar power plants or solar power projects, ] under, - (a) NationalThermal Power Corporation Ltd. National Thermal Power Corporation Ltd. NTPC Bhavan, Scope Complex, 7, Lodhi Road, Institutional Area, New Delhi - 110 003. (b) Tehri Hydro Development Corporation Ltd. Tehri Hydro Development Corporation Limited Bhagirathi Bhawan (Top Terrace), Bhagirathipuram, Tehri Tehri (Garhwal) 249 001(UP). (c) Nathpa Jhakri Power Corporation Ltd. Nathpa Jhakri Power Corporation Limited Himfed Building Khalini, Shimla (HP). (d) North Eastern Electric Power Corporation Ltd. North Eastern Electric Power Corporation Limited Brookland Compound Lower New Colony Shillong - 793 001. (e) National Hydroelectric Power Corporation Ltd. National Hydroelectric Power Corporation Limited NHPC Office Complex Sector-33, Faridabad Faridabad (Haryana). (f) Bhakra Beas Management Board. Bhakra Beas Management Board Madhya Marg, Sector-19/B Chandigarh - 160 019. (g) CentralPower Research Institute. Central Power Research Institute, Prof. C.V. Raman Road, Raj Mahal Vilas Extn. II, Stage P.O., P.B. No. 9401, Bangalore - 560 094. (h) National Power Training Institute. National Power Training Institute Sector 33, Faridabad Haryana - 121 003. (i) Power Grid Corporation of India Ltd. Power Grid Corporation of India Ltd. Hemkunt Chambers, 6th Floor, 87, Nehru Place New Delhi - 110 019. 3. 9 [ Power Plants and Transmission Projects, other than solar power plants or solar power projects and other than those mentioned at Sr. No. 2 above. ] Secretary to the State Government or UnionTerritory concerned dealing with the subject of power or electricity. 3A. Drinking Water Supply Projects for supply of water for human or animal consumption. Collector/District Magistrate/ Deputy Commissioner of the District in which the project is located.] 3B. Aerial Passenger Ropeway Project Joint Secretary to the Government of India in the Ministry of Tourism or the Secretary to a State Government dealing with subject of tourism] 3C. Water Supply Projects Collector/District Magistrate/ Deputy Commissioner of the District in which the project is located.] 3D. Pipeline projects for the transportation of crude oil, petroleum products or natural gas Ministry of Petroleum and Natural Gas.] 3E. 1 [ (a) Digital Cinema development projects (b) Digital head end project; ] Ministry of Information and Broadcasting. 4 [3F Metro Rail or Monorail projects for urban public transport Concerned State Government] 6 [3FF All Metro Rail or Monorail projects under, - (i) Kolkata Metro Rail Project Managing Director or Director (Rolling Stock and Technical) of Kolkata Metro Rail Corporation Ltd (KMRCL), HRBC Complex, KMRCL Bhawan, 2nd 3rd Floor, Munsi Premchand Sarani, Kolkata-7000021. (ii) Delhi Metro Rail Project- Delhi NCR (National Capital Region) Managing Director or Director (Electrical) or Director (Finance) Delhi Metro Rail Corporation (DMRC) Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110001. (iii) Bangalore Metro Rail Project Managing Director or Director (Rolling Stock, Signalling and Electrical) of Bangalore Metro Rail Corporation Limited (BMRCL), 3rd Floor, BMTC Complex, K.H. Road, Shantinagar, Bangalore- 560 027. (iv) Chennai Metro Rail Project Managing Director or Director (Systems and Operations) of Chennai Metro Rail Limited Admin Buiding, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai- 600107, Tamil Nadu. (v) Kochi Metro Rail Project Managing Director or Director (Systems) Kochi Metro Rail Ltd. 8th Floor, Revenue Tower, Park Avenue, Kochi- 682011, Kerala. (vi) Mumbai Metro Rail Project Managing Director or Director (Systems) Mumbai Metro Rail Corporation Limited, NAMTTRI Building, Plot No. R-13, E - Block, Bandra Kurla Complex, Bandra (East), Mumbai 400051. (vii) Lucknow Metro Rail Project Managing Director or Director (Rolling Sock and Systems) Lucknow Metro Rail Corporation (LMRC), Administrative Building, Near Dr. Bhimrao Ambedkar Samajik Parivartan Sthal,Vipin Khand Gomti Nagar, Lucknow- 226010. (viii) Ahmedabad Metro Rail Project Managing Director of Metro- Link express for Gandhi Nagar and Ahmedabad (MEGA) Company Ltd., Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhawan, Sector 10/A,Gandhi Nagar: 382010. (ix) Nagpur Metro Rail Project Managing Director of Maharashtra Metro Rail Corporation Ltd., Metro House, Bungalow No. 28/2, Anand Nagar, C K Naidu Road, Civil Lines, Nagpur- 440001. (x) Pune Metro Rail Project Managing Director of Maharashtra Metro Rail Corporation Ltd., Metro House, Bungalow No. 28/2, Anand Nagar, C K Naidu Road, Civil Lines, Nagpur- 440001. (xi) Noida Metro Rail Project Managing Director of Noida Metro Rail Corporation (NMRC), Block-III, 3rd Floor, Ganga Shopping Complex, Sector-29, Noida 201301.] 10 [ (xii) Bhopal Metro Rail Project Managing Director, Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) (xiii) Indore Metro Rail Project Managing Director, Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) ] 7 [ 3FFF High Speed Rail Projects National High Speed Rail Corporation Limited. ] 3G. 2 [ Project for installation of mechanized handling systems and pallet racking systems in mandis and warehouses for food grains, sugar and horticulture produce ] Ministry of Agriculture 3H. 5 [Cold storage, cold room (including for farm level pre-cooling), cold chain including pre-cooling unit, packhouses, sorting and grading lines and ripening chambers] or industrial projects for preservation, storage or processing of agricultural, apiary, horticultural, dairy, poultry, aquatic and marine produce and meat Ministry of Food Processing Industries.] 3 [ 3I. Green house set up for protected cultivation of horticulture and floriculture produce Ministry of Agriculture. ] 4. 11 [ Any other Plant and Project, other than solar power plant or solar power project ] . Concerned Administrative Ministry or Department. ************************ Notes: - 1. Inserted vide notification no. 15/2010 Customs dated 27/1/2010 Substituted Sr. No. 3E before it was read as:- 3E. Digital cinema development projects 2. Substituted vide Notification No. 18/2012-Cus, dated 17/03/2012, before it was read as:- Project for installation of mechanized food grain handling systems and pallet racking systems in mandis and warehouses for food grains and sugar 3. Inserted vide Notification No. 18/2012-Cus, dated 17/03/2012 w.e.f. 11th day of July, 2014 , 4. Substituted vide NOTIFICATION No. 25/2014-Customs New Delhi, the 11th of July 2014 w.e.f. 11th day of July, 2014 1 [3F. Monorail projects for urban public transport Concerned State Government 5. Substituted vide Not. 20/2016 - Dated 1-3-2016, w.e.f. 1st day of March, 2016 . before it was read as, Cold storage, cold room (including for farm level pre-cooling) 6. Inserted vide Not. 24/2017 - Dated 23-6-2017 W.e.f.23rd day of June, 2017 7. Inserted vide Notification No. 10/2021-Customs dated 01-02-2021 w.e.f. 02-02-2021 8. Substituted vide NOTIFICATION No. 54/2022-Customs dated 19-10-2022 w.e.f. 20-10-2022 before it was read as, All Power Plants and Transmission Projects 9. Substituted vide NOTIFICATION No. 54/2022-Customs dated 19-10-2022 w.e.f. 20-10-2022 before it was read as, Power Plants Transmission Projects other than those mentioned at Sl. No. 2 above. 10. Inserted vide NOTIFICATION No. 54/2022-Customs dated 19-10-2022 w.e.f. 20-10-2022 11. Substituted vide Notification No. 07/2023-Customs dated 01-02-2023 w.e.f. 02-02-2023 before it was read as, Any other Plant and Project
|