TMI BlogNotifies the various authorized operations to be used by the Board of Approval while approving authorized operations in the Special Economic ZonesX X X X Extracts X X X X X X X X Extracts X X X X ..... ard of Approval while approving authorized operations in the Special Economic Zones. This list would be used by the Board of Approval for authorizing operations to be undertaken in a Special Economic Zone which alone would qualify for exemptions, concessions and drawback. (A) Information Technology/Information Technology Enabled Services, Bio-technology and Gems and Jewellery Special Economic Zone: (i) Roads with Street lighting, Signals and Signage (ii) Water treatment plant, water supply lines (dedicated lines upto source), sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage tr ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... above from (i) to (xxvii) which the Board of Approval may authorise from time to time. (B) Sector Specific Special Economic Zones (i) Roads with Street lighting, Signals and Signage. (ii) Water treatment plant, water supply lines, sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal and Sewage treatment plants (iv) Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc (v) Security offices and police posts at entry, exit and other points within and along the periphery of the site. (vi) Effluent treatm ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... nomic Zones (i) Roads with Street lighting, Signals and Signage (ii) Water treatment plant, water supply lines, sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal and Sewage treatment plants (iv) Electrical, Gas Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc (v) Security offices and police posts at entry, exit and other points within and along the periphery of the site. (vi) Effluent treatment plant and pipelines and other infrastructure for Effluent treatment (vii) Office space and/or Shopping arcade and/or Ret ..... X X X X Extracts X X X X X X X X Extracts X X X X
|