TMI Blognotification no.X X X X Extracts X X X X X X X X Extracts X X X X ..... notification no. X X X X Extracts X X X X X X X X Extracts X X X X ..... rule. i have already entered the quantity in RGI register and after getting the processed goods what necessary entry to be passed in register. please help me thanks vinu Reply By Naveed S: The Reply: Notification No. 214/86-C.E., dated 25.3.1986 as amended from time to time. Entry in RG1 register to be made only after all processes are completed, including packing, testing, inspection etc. ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... After getting the processed goods, the same are required to be entered in the job work register as having received back, alongwith quantity, as per the job work challan. Such goods shall be termed as Work in Process goods, in case any other process are required to be carried out. However, if such goods do not required any further process, then the same may be shown in RG1 register as manufactur ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... e goods. Please note that though copper scrap are sent for job work and copper cathodes/wires/strips that are received back are no doubt your raw material/input but for excise purpose, they are not your raw material and now they are not required to be entered in Form IV/RG23aPart I register. In your case as the final product are electrical accessories, entry in RG1 register shall be done on com ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... pletion of testing and thereafter on packing of the product. X X X X Extracts X X X X X X X X Extracts X X X X
|