Transformers supplied by the assessee along with other machinery ...


High Court Rules Transformers and Machinery for Hydel Project as Renewable Energy Devices under Entry 80 of III Schedule.

September 23, 2014

Case Laws     VAT and Sales Tax     HC

Transformers supplied by the assessee along with other machinery for setting up a hydel project constitute a part of a renewable energy device and it falls within Entry 80 of III Schedule - HC

View Source

 


 

You may also like:

  1. The GAAR held that specially designed transformers for WOEG performing dual step-down and step-up functions, supplied by the appellant along with WOEG, cannot be treated...

  2. Input tax Credit - capital goods - The infrastructure is used for making outward supply of services; that the transformers, Network Grid, Cables etc. shall qualify as an...

  3. Exemptions on import of various goods and inputs for specified purposes such as research and development, manufacture of specified products like fertilizers,...

  4. Invocation of constitutional jurisdiction under Article 32 - seeking directions relating to the conservation of the species - Right to a healthy environment and freedom...

  5. Project import - benefit of Notification No. 6/2002-CE dt.1.3.2002 - the exemption cannot be extended to turbine which converts heat energy into rotational energy...

  6. Rate of GST on services relating to setting up of solar power projects - 18% or 5% - Determination of value of services involved - GST Council has given clarity on...

  7. Claim of exemption - manufacturer of industrial valves - conventional energy device or non-conventional energy device - Benefit of Notification No.6/2002-CE dt. 1.3.2002...

  8. Project import - Prima facie, Turbine does not produce energy without being integrally connected to other energy producing devices. Therefore any grant of exemption...

  9. Mega Power Project - Exemption under Notification no. 21/2002 - Project Import - Import of ‘gas turbine components’ and ‘generator transformers’ - Benefit of exemption denied - AT

  10. Disallowance of depreciation on account of energy saving and pollution control devices - AO has not disputed the fact that the devices were installed. The level of...

  11. Classification of goods - rate of GST - the steam was generated out of waste cannot lead to the conclusion that the turbine is a renewable energy device. The same...

  12. Input tax Credit - capital goods - The renewable energy device & spare parts, Boilers, Boiler components and materials for Erection of Boilers are integral parts or...

  13. Applicable GST rate on Priority Sector Lending Certificates (PSLCs), Renewable Energy Certificates (RECs) and other similar scrips.

  14. Project is falling under "other than On-going Projects" - New project or not - The Notification No. 03/2019 makes a distinction between ‘Ongoing project’ in clause (xx)...

  15. Project import - warehoused goods - contract registered after filing an into bond Bill of Entry but before filing of an ex-bond bills of entry for home consumption -...

 

Quick Updates:Latest Updates