TMI BlogThird ScheduleX X X X Extracts X X X X X X X X Extracts X X X X ..... wenty rupees per thousand, whichever is higher. shall be substituted; (ii) in Item No. 18, for the entries in the third column against sub-Items I (i), II (i) (a) and II (i) (b), the entries Ten rupees per kilogram. , Ninety-five rupees per kilogram. and One hundred and five rupees per kilogram. shall, respectively, be substituted; (iii) in Item No. 68, for the entry in the third column, the entry ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... han those falling under sub-Item (1)- (a) for each unit container containing 200 millilitres or less Sixty paise. (b) for each unit container containing more than 200 millilitres Sixty paise plus thirty: paise for Every 100 millilitres or fraction thereof in excess of 200 millilitres. (c) others Sixty per cent ad valorem. ; (ii) in Item No. 16, for sub-Item I, the following sub-Item shall be subst ..... X X X X Extracts X X X X X X X X Extracts X X X X ..... n printing), not elsewhere specified. Ten per cent. ad valorem plus two thousand and five hundred rupees per metric tonne. ; (b) sub-Items (3) and (4) shall be renumbered as sub-Items (2) and (3) respectively; (iv) in Item No. 23, for sub-Item be substituted, namely:- (1) Grey portland cement (including ordinary portland cement, portland-pozzolana cement and portland slag cement), masonry cement, ..... X X X X Extracts X X X X X X X X Extracts X X X X
|